External costs: what a new build costs after the builder hands over

A building contract usually ends at the house. The driveway, fencing, landscaping, garage floor and blinds are separate trades, organised and paid for by the owner. This guide shows what they typically cost.

Educational information only

This guide is general, educational information to help you understand typical costs and choices. Prices are approximate, based on examples seen in south-east Queensland in 2024–2026, and will vary with location, size, materials, supplier and time. It is not financial, legal, building or professional advice, and not a quote. Always get written quotes from licensed trades and check your own contracts before making decisions.

A new house at handover with bare dirt at the front
At handover
A new house with a finished driveway, garden and fence
After the external works
Typical total$45k – $60k

Single-storey house, standard finishes

Largest item$15k – $25k

Driveway and paths

Share of the build price10 – 12%

On a build of about $440,000

Paid fromSavings

Construction loans do not usually cover these

Typical costs, item by item

ItemWhat it coversTypical cost
Driveway and pathsExposed aggregate driveway, side paths and an alfresco or porch slab$15,000 – $25,000
LandscapingTurf, garden beds, edging and planting, front and back$5,000 – $10,000
Side and rear fencingAbout 40 m of timber paling fence, lapped and capped$5,000 – $8,000
Share of a boundary fenceContribution when a neighbour has already built a shared fence$750 – $2,000
Side gateAluminium slat gate with a return panel$1,300 – $2,500
Alfresco and porch tilingOutdoor tiles, grout and labour$4,000 – $5,500
Garage floorFlake epoxy on a double garage (about 36 m²); allow extra if a damp-proof membrane is needed$2,700 – $3,200
BlindsRoller blinds throughout$2,200 – $4,500
Letterbox and clotheslineSupply and install$500 – $1,000
Total$45,000 – $60,000

For a single-storey house of about 250 m² on a 350–450 m² lot. Ranges are based on paid invoices for recent houses in south-east Queensland estates, rounded and including GST.

Driveway and paths

Reinforcing mesh laid for a side path
Mesh laid for the side paths
New exposed aggregate driveway taped off while it cures
Exposed aggregate driveway, curing

Usually the biggest single cost. Exposed aggregate costs more than plain concrete but is the most common finish in new estates. Concrete normally goes first, because the landscaper and fencer work to its levels.

Landscaping, fencing and gates

A timber slat front fence with rendered pillars being built
A front fence going up
Finished front garden with shrubs, white pebbles and a slat fence
A finished front garden and slat fence

Landscapers often quote fencing, the clothesline and letterbox installation together. Where a neighbour has already built a shared boundary fence, you may be asked to pay half. Many estates have design rules for front fences, driveways and front gardens, so check them before getting quotes.

Garage floor, outdoor tiles and blinds

Garage with a grey flake epoxy floor
Flake epoxy on a garage slab
Living room with roller blinds on the sliding door and window
Roller blinds fitted before moving in

Epoxy quotes can rise if the slab needs a damp-proof membrane, so ask about it up front. Blinds can be measured before handover and paid with a deposit, so they are fitted in the first weeks.

Often not in the contract

Ducted air conditioning, if not in the contract$8,000 – $9,000
Fly and security screens$3,000 – $6,000
Ceiling fans and towel rails$300 – $600 each installed
Final clean before moving in or lettingabout $450

Check the inclusions list in your building contract; some builders include these as standard or as upgrades.

Costs when the land settles

Stamp duty on the landNil for eligible first home buyers in QLD; otherwise about $10,000 on a $340,000 lot and $19,500 on a $589,000 lot
Titles Office registrationabout $1,200
Conveyancing$1,000 – $1,500
Electronic settlement feeabout $140

Queensland transfer duty from the Queensland Revenue Office rate table. See the 2026 rules for first home concessions.

Ongoing costs from settlement

Council rates (new house in a Logan estate)about $4,300 – $4,600 a year
Home or landlord insuranceabout $1,500 – $2,500 a year
Pest barrier and inspectionabout $250 – $500 a year

What helps

  • Budget about 10–12% of the build price for external works, in cash
  • Get concrete, landscaping and fencing quotes before handover, so trades can start in the first weeks
  • Ask the builder for the handover date early; many of these trades book weeks ahead
  • Check estate design rules for driveways, fences and front gardens
  • Keep every invoice: for an investment property they add to the cost base for capital gains tax

Typical ranges for south-east Queensland, 2025–26, including GST. Actual prices vary with lot size, finishes and trade availability. General information for planning only, not financial advice. Related: Property Construction Analysis: Greenbank QLD 4124.

Disclaimer

Everything on this page is for educational and informational purposes only. Costs, prices, interest rates, rules and government schemes change over time, and the figures shown are approximate examples that may already be out of date. Nothing here is financial, tax, legal, building or professional advice, a recommendation or a quote. Do your own research, get written quotes and seek advice from qualified professionals before making any decision.

For builders

Handover is not the end of the job for your customer.

PropertyMaths gives owners a clear handover date, a product register and a home record they can share with their own trades.